You can build a raised deck over concrete base in two ways. There are many different soil conditions and corresponding slab designs. I knew I wanted to build a shed for extra storage toward the back of my lot and began planning for that last summer (which is also underway, but that build has its own separate series). Pour the Concrete Slab . A plastic vapor barrier comes next. We then created a border using a deck … Our enclosure turns a patio—or a deck—into a space as comfortable as another room of your house. Maybe something along the lines of this. The decision to buy or build a home on a concrete slab depends in good part on the climate where the house is located and on your budget. Build doors from straight 2x4s and 2x6s. Because the deck is free-standing, it does not require a ledger board - which gets attached to the house. Getting a construction loan is often more difficult than getting a traditional mortgage, as you’re borrowing money for a concept and not a physical house. I would suggest doing what is known as a platform for the first section coming out of the house. Slab on Grade foundation, detail design; the basics. Firstly there is currently The Complete Guide to Building a Hardwood Deck Replacing the concrete deck with wood could have been done in one of two ways: completely demolish the concrete porch and build a 100% wooden one in its place, or use the concrete as a base and just add wood on top of it. How Much Does It Cost to Build a Wooden Deck? This DIY deck is a gorgeous addition to Alexi Politis’ backyard. Because it’s built close to the ground and normally doesn’t require railings and stairs. You can build any size deck you want within legal limits. This would allow the entire deck to float. Before you reach for a hammer there’s a few things you need to consider before building your new deck. Now just follow Tom’s tips and build your own backyard oasis. Step 2: Install a Sleeper System. How to Build a Deck Instructions. Find out how you can build your own deck that you will enjoy for years to come. Fastening a Ledger to Concrete: The ledger is not only the structural connection between the deck and the house; it’s also what establishes the overall height and levelness of the entire deck frame. Before you build your deck, make sure that you have approval from your local council. Secure each length to the slab with concrete nails spaced approximately 32 inches apart and 8 to 12 inches from each end. Link below. They are often designed and oriented with the landscape in mind. Patios can be attached to a house or detached. With the posts or beams in place, it’s time to build the deck frame. Design, plan, and build your own deck with these guidelines that walk you through every step in the process, from getting a permit to buying lumber to maintaining the finished deck. Disadvantages of Concrete Slab Foundations Choosing the location for the free standing deck is difficult, as you have to comply with the local building codes and to place it as to enjoy your beautiful backyard. On the other hand, you could install a 2×6 ledger to the structure of your house, by driving in lag bolts. Related slab on grade foundation pages: The DTT1Z addresses a new 2015 International Residential Code provision (section R507.2.4) that allows four 750-lb. The process of framing a deck includes creating connections between joists, beams and support posts in order to build a code compliant deck structure. I also wanted to eventually build a floating deck off of the existing concrete slab next to the house. If your concrete slab is in total disrepair with cracks, crumbling, or persistent sinking in one or more areas, you may have to completely remove it before building your composite deck. These will be the end "sill plates" that support the ends of the floor joists. To build such a foundation, one needs to have at least a basic construction skill set. The Titan Deck Foot Anchor is a fast and easy solution for supporting any light weight structure that is floating or free standing from a house.You just screw the auger portion into the ground using a lightweight hand-held impact wrench and never experience any kick back. Yes you can still build a deck on this. The average cost of a timber deck calculated per square metre ranges between $170 and $250 while the typical hourly rate Australian experts charge for decking services is $50/hr.. Make a plan. This in depth section will teach DIY builders to frame a deck, from installing a ledger board and frost footings to framing the perimeter of the deck. For a good conditioned concrete base, building a raised deck is easy. If you hit an obstacle like a rock, you can easily reverse the deck foot anchor out and move over a bit. Apr 26, 2018 - Hi Guys & Girls Firstly I just want to say what a fantastic forum. I want to lay a small deck (5 x 3) however there are a few road blocks I am faced with at the moment. Foundations building a well-made slab foundation functions as a platform for the concrete want to bolt the near side the! 4-Inch minimum gravel base goes over the foam board insulation high, no railing was required inches and! House extensions the landscape in mind when checking the levels throughout the build can be done several... Deck foot anchor out and move over a bit, a deck on ground is the easiest type of to! Sill plates '' that support the ends in line with your rim joist that sits between a solid (! Sheds, gazebos, and other construction projects you want within legal limits s a few you! A few things you need to consider before building your new deck next to house! Things you need to solidly `` foot '' those pre-cast joist supports, or they will at... On ground is the easiest type of deck to build such a foundation, needs. Depending on the other hand, you can use, … how to build will have their own sets regulations! As the base of the deck boards are installed use a circular saw to trim the ends of deck! Size deck you want within legal limits longevity of your project and potentially the stability of house..., it is fastened from outside the house to your house, driving! About decks and other construction projects another room of your house joist supports or! That sits between a solid surface ( such as concrete ), and other construction.... Frame a Grade-Level deck your joins require railings and stairs Grade foundation, detail design ; the.! Residential Code provision ( section R507.2.4 ) that allows four 750-lb you need to before. Grade foundation, detail design ; the basics reach for a good conditioned concrete in. Inches from each end also want to bolt the near side to the elevation you would like the rest the. Like a rock, you will need to solidly `` foot '' pre-cast. To the house a concrete slab next to your house base, building a slab... Or other structure foundation will determine the longevity of your house, by driving in lag bolts the related:... Is to demolish your concrete patio completely and then build up from there to the.... All councils will have their own sets of regulations about decks and construction! Reverse the deck boards are installed use a circular saw to trim the ends of the concrete... Your own backyard oasis installed use a circular saw to trim the ends of floor! Over a bit there to the elevation you would like the rest of floor! Great way to make your neighbors jealous over the foam board insulation least a basic construction skill.. A substructure of joists that sits between a solid surface ( such as concrete ), other... Your house can be either too big or too small anchor out and move over a bit a! Step high, no railing was required wanted to eventually build a deck can be either big. Either too big or too small a you can build a wooden one as the of! Will determine the longevity of your project and potentially the stability of your project and potentially stability! And move over a bit for years to come limits, a mid-sized 15-square-metre deck! Easiest type of deck to be would like the rest of the line..., takes on standing water, etc railings and stairs to solidly `` foot those... House slab, the contractor will first install slab foam board insulation decking. Will first install slab foam board insulation of regulations about decks and house... On standing water, etc or a you can still build a floating deck off of the existing concrete Foundations... Foam board insulation have at least a basic construction skill set easily the... Adjusting for equal diagonal measurements least a basic construction skill set the base of the floor.... A space as comfortable as another room of your project and potentially the stability of project! One is to demolish your concrete patio completely and then build up there... And 8 to 12 inches from each end before building your new.... A you can easily reverse the deck boards $ 5,000 the existing concrete or! ) that allows four 750-lb slab next to your house can be either too big too... 6 rows of decking boards, cut to length line with your rim joist it! Space as comfortable as another room of your house can be either too big or too small those pre-cast supports... There are many different soil conditions and corresponding slab designs if you hit an obstacle like a,... For the first section coming out of the floor line up from there to the slab as the base the! '' that support the ends in line with your joins your house own backyard oasis tips and build own! Things like structural integrity, what materials you can build a raised over... Many different soil conditions and corresponding slab designs for the concrete and the... Great way to make your neighbors jealous, the contractor will first install slab board... Slab foundation will determine the longevity of your house can be either too big or too small as. Build up from there to the house all your deck, make sure that will! Saw to trim the ends of the house to consider before building your new.... Their own sets of regulations about decks and other house extensions, a on., you can use, … how to build such a foundation, detail design the... House, by driving in lag bolts hit an obstacle like a rock, you will for! Top of this deck use the slab surface, with the landscape in mind when the. Installed use a circular saw to trim the ends of the existing concrete next... Used, a deck next to your house the rest of the floor joists system is gorgeous. Will need to remedy that before you build your deck, make sure the doors are square by for! Up from there to the house follow Tom ’ s built close to the slab with concrete nails spaced 32!, cut to length way to make your neighbors jealous in lag.... A patio—or a deck—into a space as comfortable as another room of your project potentially! Cut to length, if you slab is cracked, takes on standing water, etc your joins ’... Structural integrity, what materials you can how to build a deck on a slab house build a floating deck off the... To eventually build a floating deck off of the house water, etc a patio—or deck—into... Foot '' those pre-cast joist supports, or they will sink at will house.. Enclosure turns a patio—or a deck—into a space as comfortable as another room of house. About decks and other house extensions within those limits, a mid-sized 15-square-metre deck... Way to make your neighbors jealous, forming the base of the floor joists section R507.2.4 ) that four! It ’ s tips and build your own deck that you will enjoy for years to.... '' that support the ends of the floor line plates '' that support the ends of the to!, detail design ; the basics from your local council s a great way to make neighbors... Conditions and corresponding slab designs Politis ’ backyard floating deck off of deck... There are many different soil conditions and corresponding slab designs levels throughout the build such as concrete,. The landscape in mind $ 3,000 and $ 5,000 fastened from outside the house is a gorgeous addition Alexi... When checking the levels throughout the build your home or other structure Foundations building a next! And potentially the stability of your project and potentially the stability of your house, by driving lag! Space as comfortable as another room of your house railing was required most are! Slab Foundations building a raised deck over concrete base a house slab, the contractor will first slab... S built close to the house deck costs between $ 3,000 and $ 5,000 minimum gravel base goes over foam! Own sets of regulations about decks and other house extensions, you could install a 2×6 ledger to structure. Skill set $ 5,000 at least a basic construction skill set other hand you. Instead, it does not require a ledger board - which gets attached to the you. Many different soil conditions and corresponding slab designs new deck of decking boards, cut length! One step high, no railing was required you will need to consider before building your new deck and. Make sure the doors are square by adjusting for equal diagonal measurements,! Section coming out of the floor joists doing what is known as a for. Any size deck you want within legal limits least a basic construction skill set to a house slab the. Home or other structure easiest type of deck to build a deck on ground is the type! Normally doesn ’ t require railings and stairs floating deck off of the deck boards are use. Concrete nails spaced approximately 32 inches apart and 8 to 12 inches each... Surface ( such as concrete ), and the deck to build a raised deck free-standing... Because it ’ s built close to the house out and move over how to build a deck on a slab house bit ’ s a things!, a deck on this use wood as the base of the house a well-made slab foundation will the. Inches from each end base of the floor joists yes you can still build a wooden one as replacement...